Riunet Móvil

Home Versión de escritorio

Proyecto de ejecución y seguimiento de un edificio comercial en dos alturas

Mostrar el registro sencillo del ítem

dc.contributor.advisor Albiol Ibáñez, José Ramón es_ES
dc.contributor.author Baringo Flores, Óscar es_ES
dc.date.accessioned 2024-10-23T11:24:15Z
dc.date.available 2024-10-23T11:24:15Z
dc.date.created 2024-09-26
dc.date.issued 2024-10-23 es_ES
dc.identifier.uri http://hdl.handle.net/10251/210751
dc.description.abstract [ES] Seguimiento de la ejecución de un edificio comercial de dos alturas, Planta baja (parking) + Planta primera (sala de ventas). Se realizará un seguimiento de la ejecución de la obra, con incorporación durante la fase estructura, en concreto con cimentación y pilares de planta baja ya emplazados. La cimentación, se realizará mediante pilotes, en planta baja y la primera estructura se ejecutará mediante pilares y forjados (placa alveolar) prefabricados de hormigón. La rampa de acceso al muelle de carga y descarga se realizará con losa in situ en el primer tramo y prefabricado y muros de hormigón en el resto. En la planta sala de ventas, los cerramientos se harán con placa prefabricada de hormigón, con el pertinente aislamiento térmico y recubrimiento de paneles de chapa metálica en el exterior. El altillo técnico será de hormigón prefabricado con placas alveolares de 25cm y jácenas de hormigón prefabricado. La cubierta plana ligera se ejecutará sobre cerchas metálicas. Se tendrá en cuenta también, la normativa de accesibilidad y de prevención contra incendios correspondiente a la actividad que se desarrollará en él, sectorización, resistencia al fuego de materiales, instalaciones, etc. es_ES
dc.description.abstract [CA] Seguiment de l'execució d'un edifici comercial de dues alçades, planta baixa (estacionament) + planta primera (sala de vendes). Es realitzarà un seguiment de l’execució de l’obra, amb incorporació durant la fase estructura, en concret amb fonamentació i pilars de planta baixa ja emplaçats. La fonamentació es realitzarà mitjançant pilots, en planta baixa i primera, l'estructura s'executarà mitjançant pilars i forjats (placa alveolar) prefabricats de formigó. La rampa d'accés al moll de càrrega i descàrrega es realitzarà amb llosa in situ al primer tram i prefabricat i murs de formigó a la resta. A la planta sala de vendes, els tancaments es faran amb placa prefabricada de formigó, amb el corresponent aïllament tèrmic i recobriment de panells de xapa metàl·lica a l'exterior. L'altell tècnic serà de formigó prefabricat amb plaques alveolars de 25cm i jàsseres de formigó prefabricat. La coberta plana lleugera s'executarà sobre encavallades metàl·liques. Es tindrà en compte també, la normativa d'accessibilitat i de prevenció contra incendis corresponent a l'activitat que s'hi desenvoluparà, sectorització, resistència al foc de materials, instal·lacions, etc. es_ES
dc.description.abstract [EN] Monitoring of the execution of a two-story commercial building, ground floor (parking) + first floor (sales room). The execution of the work will be monitored, with incorporation during the structural phase, specifically with foundations and ground floor pillars already in place. The foundation will be made using piles, on the ground and first floor the structure will be built using prefabricated concrete pillars and slabs (honeycomb plate). The access ramp to the loading and unloading dock will be made with an in-situ slab in the first section and prefabricated and concrete walls in the rest. On the sales floor, the enclosures will be made with prefabricated concrete slabs, with the relevant thermal insulation and coating of sheet metal panels on the outside. The technical loft will be made of precast concrete with 25cm hollow core slabs and precast concrete girders. The light flat roof will be built on metal trusses. The accessibility and fire prevention regulations corresponding to the activity that will be carried out there, sectorization, fire resistance of materials, installations, etc. will also be taken into account. es_ES
dc.format.extent 1286 es_ES
dc.language Español es_ES
dc.publisher Universitat Politècnica de València es_ES
dc.rights Reserva de todos los derechos es_ES
dc.subject Edificios comerciales es_ES
dc.subject Control de procesos es_ES
dc.subject Control de calidad es_ES
dc.subject Seguridad en el trabajo es_ES
dc.subject Análisis coste-beneficio es_ES
dc.subject Edificis comercials es_ES
dc.subject Control de processos es_ES
dc.subject Control de qualitat es_ES
dc.subject Seguretat en el treball es_ES
dc.subject Cost-eficàcia es_ES
dc.subject Commercial buildings es_ES
dc.subject Process control es_ES
dc.subject Quality control es_ES
dc.subject Industrial safety es_ES
dc.subject Cost effectiveness es_ES
dc.subject ODS es_ES
dc.subject.classification CONSTRUCCIONES ARQUITECTONICAS es_ES
dc.subject.other Grado en Arquitectura Técnica-Grau en Arquitectura Tècnica es_ES
dc.title Proyecto de ejecución y seguimiento de un edificio comercial en dos alturas es_ES
dc.title.alternative Execution and monitoring project of a commercial building in two heights es_ES
dc.title.alternative Projecte d'execució i seguiment d'un edifici comercial en dos altures es_ES
dc.type Proyecto/Trabajo fin de carrera/grado es_ES
dc.rights.accessRights Cerrado es_ES
dc.contributor.affiliation Universitat Politècnica de València. Departamento de Construcciones Arquitectónicas - Departament de Construccions Arquitectòniques es_ES
dc.contributor.affiliation Universitat Politècnica de València. Escuela Técnica Superior de Gestión en la Edificación - Escola Tècnica Superior de Gestió en l'Edificació es_ES
dc.description.bibliographicCitation Baringo Flores, Ó. (2024). Proyecto de ejecución y seguimiento de un edificio comercial en dos alturas. Universitat Politècnica de València. http://hdl.handle.net/10251/210751 es_ES
dc.description.accrualMethod TFGM es_ES
dc.relation.pasarela TFGM\163025 es_ES


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

 

Tema móvil para Riunet